Guarantee & Highlights

Guarantee

We offer:

  • A breakthrough technology which will set new stan- dards in power generation for the coming decades
  • To take over all necessary investments, as well as   all operation risk and costs for the entire contract time
  • To guarantee the volume of cleaned water and power as agreed in the contract
  • Costs per kWh at a very competitive level
  • To limit the time of the review preparatory to a maximum of 60 days
  • To start the power plant within 180 days after the   signing of the PPA (Power Purchase Agreement)

We need:

  • A purchase guarantee (contract) for the purified wa- ter and the electricity generated (at least 15 years, with fixed conditions on the entire period of the contract)
  • An area of just 2000 m³ per 280 MW unit
  • The volume of water, guaranteed in the contract, to be delivered to the plant
  • The guarantee that the purified water and the elec- tricity produced at our plant will be picked up
  • The appropriate authorisations to operate the plantand the classification in the appropriate remuneration system

HIGHLIGHTS:

Aqua Power is perhaps the greenest in the world. It is self-powering, meaning that it needs no external power source to run; it is self-maintaining, so it needs no labour force. Aqua-Power builds redundancy into every system on both the water and power side of our service. We stock the pumps, hoses and other common parts on-site, so they are readily available forour authorised service technicians. In addition, we have software and sensor systems built into the systems that allow remote monitoring and security.

Aqua-Power guarantees the product for the life of the contracts for services, or in line with the terms of the water and power agreement, and maintains the equipment for the lifetime of the equipment at no charge to the client.

Aqua-Power does not consume carbon fuels, such as coal, oil or natural gas, but converts pollutants during the water refining process into energy, ensuring a carbon credit not a carbon footprint.

Each unit Aqua-Power is remotely monitored by the plant personnel to assure optimal performance.

The produced electricity is easy to regulate. An Aqua-Power plant can change from 10% efficiency to 135% or from 135% to 10% in minutes. It is very straightforward and easy to improve the demand of peak demands.

NO INVESTMENT COSTS FOR THE CUSTOMERS (except pipelines and grid from and to the Aqua-Power plant.

In contrast of all other known and common power plants present generations the Aqua-Power plants nees a minimum of the space and construction time. The actual construction time for fossil power plants with a comparable nominal capacity between 7 and 15 years including the period of permitting and application depending on the fuel used. Aqua-Power plants need a construction time of just 180 days (possible schedule extension because of high order income) after a PPA has been signed.

Coal power plants with a niminal capacity of 1500 MW need an area of approimately 80000 to 150000 m² depending on external implemented systems like surface water treatment and storing. An Aqua-Power plant with a similar capacity needs an area of just 12000 m² which conforms the size from 2 soccer fields. As the Aqua-Power plants needs no smoke-stacks, no extensive fuel storage, it will be built into conventional industrial buildings/hangers. Every 280 MW unit needs a footprint of just 35 x 65 m. The height of an Aqua-Power plant building should be at least 6 meters.

The halls will be designed in accordance with the ideas of the customer. The times when power plants disfigured the landscape belong to the history. Because Aqua-Power plants produce no noise nor odor emissions. Aqua-Power plants can even be constructed directly in the neighborhood of urban regions.